SEO Dons Editorial

The team writing the guides, comparisons, and DNO deep-dives across this site — independent research, sourced data, no installer affiliation.

Who we are

SEO Dons Editorial is the research and writing arm of SEO Dons Ltd, the independent guidance service behind this site. Our editorial output covers practical guides, technology comparisons, DNO-specific G99 walkthroughs, grant deep-dives, planning law explainers, and worked examples. We are not an installer — which means no equipment to promote and no delivery pipeline to fill.

The blog posts, building-type comparison guides, DNO deep-dives, and location resources on this site are written internally by our editorial team — not outsourced to generalist freelancers. Every claim, statistic, and figure on the site is cross-checked against a primary source (DNO published data, the MCS database, Ofgem publications, Defra grant frameworks, manufacturer datasheets, RICS construction cost benchmarks).

Editorial standards

  • Primary-source verification — every numerical claim sourced and cross-checked. We cite source publications and update dates explicitly.
  • Annual refresh cycle — every content page reviewed at least annually. Cost figures, payback projections, and DNO timelines updated as material change.
  • Internal review — every guide reviewed against its primary sources before publication.
  • Transparency on uncertainty — where data is contested, evolving, or projection-based, we say so explicitly rather than presenting it as settled fact.
  • Plain English first — we write for working farmers and farm decision-makers, not industry insiders. Technical jargon is defined on first use.
  • No paid placement, no manufacturer rebates — our manufacturer comparison guides reflect independent assessment, not commercial relationships.

Topics covered

The editorial coverage spans the full UK farm solar delivery stack:

  • Commercial agricultural solar PV design, planning, and delivery
  • Combined re-roof + PV programmes on asbestos cement and pre-2000 cladding
  • UK DNO G99 grid connection — all six regional DNOs
  • Permitted Development Order Class J, Part 14 interpretation
  • Listed Building Consent and AONB / National Park design assessment
  • Supplier Scope 3 emissions documentation for major UK retailers
  • 100% Annual Investment Allowance and capital allowance tax modelling
  • Farm grant windows in England, Wales and Scotland — what is open and what has closed
  • BS EN 62305 lightning risk assessment
  • Insurance-Backed Warranty (IWA), tier-1 module warranty, performance warranty management
  • Battery storage sizing and time-of-use tariff arbitrage
  • Multi-building solar farm project management — RIBA stages 1-7

How the numbers stay honest

The editorial method behind every figure on this site:

  • Every rate and grant figure sourced from Ofgem, DESNZ, HMRC and supplier tariff pages
  • SEG export rates dated per quote — last reviewed July 2026
  • Grant and scheme coverage re-verified against the live scheme pages each quarter
  • No installer, manufacturer or distributor affiliation — no commission bias
  • Corrections published in place when a scheme closes or a rate moves

How to reach us

Spot a factual error, want to dispute a comparison, or have a primary-source citation you think we should reference? Email the editorial team at editorial@solarpanelsforfarmbuildings.co.uk. We reply by email, and we publish a correction once an error is confirmed.

Related pages

Independent, data-led farm solar guidance

  • Independent specialist guidance
  • Sourced 2026 rates & grant data — last reviewed July 2026