UK Farm Solar Glossary

Plain-English definitions of UK farm solar PV terminology. 100+ terms covering technology, regulation, finance, and operations.

  • Updated 2026
  • 100+ terms
  • UK-specific

This glossary defines every key term used across our farm-building solar PV resources. Each entry is plain-English with practical relevance to UK farm operations. If a term you need isn't here, contact us and we'll add it.

100% AIA
100% Annual Investment Allowance — UK tax relief that allows full year-one expensing of qualifying capital expenditure including solar PV. Applies up to £1m per business per year. Effective tax saving roughly 25% for incorporated farms at 25% corporation tax.
AC-coupled battery
Battery storage system with its own inverter that connects to the existing AC distribution, separate from the PV inverter. More flexible for retrofit installations but slightly less efficient than DC-coupled.
African Swine Fever (ASF)
Viral disease affecting pigs. UK biosecurity protocols (Pig Health Scheme) apply during any work on pig finisher or breeding sites, including PV installation crews.
Agrivoltaics
Combined agricultural use of land beneath ground-mount solar PV installations. UK applications include sheep grazing under raised panels and crop production beneath translucent panels.
Air Termination System
Lightning protection roof-mounted rods that provide preferred strike points, conducting strike current via dedicated copper down-conductors to earth electrodes. Required for LPL I/II installations.
AONB
Area of Outstanding Natural Beauty. UK protected landscape designation that may add planning consultation requirements for ground-mount installations.
Arla 360
Dairy farm assurance and sustainability programme operated by Arla Foods. Includes specific points for on-farm renewable energy and Scope 2 reduction.
Asbestos Cement (AC)
Pre-2000 roof cladding containing chrysotile asbestos. Under Control of Asbestos Regulations 2012, cannot be retrofitted with PV — requires trained (non-licensed under CAR 2012) removal first.
Asbestos Removal Notification
Mandatory 14-day HSE notification required before any asbestos removal work begins. Submitted by licensed asbestos contractor.
Asset Finance
Bank or specialist lender financing for solar PV capital expenditure, typically 5-10 year term, secured against the asset. Most farm installs are EBITDA-positive from month one under asset finance.
AVI (Avian Influenza)
Highly Pathogenic Avian Influenza. UK biosecurity protocols (Avian Influenza Order 2006) apply during any work on poultry sites including PV installation crews.
Bifacial Panels
Solar panels capable of generating from both sides — front face and rear reflected light. Useful in ground-mount and east-west installations. Currently 5-10% more expensive than monofacial.
BS 7671
UK Wiring Regulations. Section 712 covers Solar PV Power Supply Systems. Mandatory compliance for all UK commercial PV installations.
BS EN 62305
European Lightning Protection standard. Risk assessment methodology determining required Lightning Protection Level (LPL).
BYD
Chinese tier-1 battery manufacturer (world's largest EV battery producer). Battery-Box Premium HV range common on UK commercial farm installs.
CAR 2012
Control of Asbestos Regulations 2012. UK regulations governing all work involving asbestos. Prohibits PV installation directly on asbestos cement cladding.
CDP Supply Chain
Formal supplier emissions reporting framework operated by CDP (Carbon Disclosure Project). Used by major UK retailers to track Scope 3 emissions through their supply chains.
Class J, Part 14 GPDO 2015
Permitted Development order covering solar PV on agricultural buildings. Allows rooftop PV without formal planning permission for most agricultural buildings.
Combined re-roof + PV
Standard project structure for buildings with asbestos cement cladding — asbestos cement removal by trained operatives followed by profiled steel re-cladding followed by PV install on the new roof.
Commissioning
Final stage of PV installation when the system transitions to operational status. Includes electrical safety testing, functional verification, MCS paperwork submission, and monitoring portal setup.
Conservation Area
UK planning designation that may add visual-impact consultation requirements for rooftop and ground-mount PV.
CSP (Sheep) Bioassurance
Sheep welfare and assurance programme. UK biosecurity protocols for sheep finishing operations during PV installation.
DC AFCI
DC Arc Fault Circuit Interruption. Modern inverter feature that detects arc faults on DC strings and shuts down the inverter within milliseconds. Per IEC 63027. Standard on inverters from 2020 onwards.
DC-coupled battery
Battery storage that shares the PV inverter (battery connects on the DC side before inversion). Slightly more efficient than AC-coupled, must be designed in from system inception.
Decommissioning
End-of-life removal of solar PV installation including panels, racking, cabling, and structural mounts. Typical cost £40-£80 per panel for rooftop, £8-£15 per panel for ground-mount.
Default Tariff Tracker
Ofgem-set price cap for default electricity tariffs. Relevant for understanding grid retail tariff trajectory affecting solar self-consumption economics.
DNO
Distribution Network Operator. Six UK DNO groups: National Grid Electricity Distribution, UK Power Networks, Northern Powergrid, Electricity North West, Scottish Power Energy Networks, SSEN. Responsible for distribution-level grid connections.
East-West Orientation
PV array orientation with panels facing east and west rather than south. Generates 10-15% less than south-facing but spreads generation across the day, often improving self-consumption ratio.
EBITDA-positive
Earnings Before Interest, Tax, Depreciation, Amortisation. Asset-financed PV installations are typically EBITDA-positive from month one — meaning monthly grid-cost saving exceeds monthly finance payment.
EcoVadis
Third-party sustainability rating used by major UK supermarket suppliers. References on-farm renewables in supplier sustainability scoring.
EIA (Environmental Impact Assessment)
Required for ground-mount solar above 5 MW or in sensitive locations. Typically 6-12 month process including ecological survey.
EICR
Electrical Installation Condition Report. Periodic electrical safety testing required every 5 years on commercial installations per BS 7671.
Equipotential Bonding
Electrical safety measure connecting all metallic building structures to the main earth terminal. Required by BS 7671 and BS EN 62305.
Eternit (Cembrit)
Major manufacturer of modern fibre cement cladding (the post-1999 replacement for asbestos cement). PV-compatible.
Farming Connect
Welsh advisory service supporting farms with grant applications including renewable energy projects.
Farming Investment Fund (FIF)
Defra capital grant scheme supporting productivity-improving farm investments. Solar typically not directly eligible but can be paired with eligible items (robotic milking, grain dryers).
Feed-in Tariff (FiT)
Closed UK renewable energy support scheme (closed to new applications March 2019). Existing recipients continue receiving payments for the original contract length.
Fibre Cement (FC)
Modern roof cladding using cellulose and polymer fibres (replacing asbestos from 1999+). PV-compatible directly.
Fixed-price proposal
Quote for solar PV installation with all costs locked in, no variation clauses. Standard from reputable installers post-survey.
Formspree
Online form processing service used for quote form submission on solarpanelsforfarmbuildings.co.uk.
G98
Engineering Recommendation governing connection of distributed generation up to 16A per phase. Below this threshold, simpler grid connection process applies.
G99
Engineering Recommendation governing connection of distributed generation above 16A per phase (above ~17 kW at 240V). Required for almost every commercial farm PV install.
Ground-mount Solar
PV installation on ground-mounted racking rather than rooftop. Common for systems above 250 kW where building roof area is insufficient.
GSC
Google Search Console. Used for sitemap submission and indexing monitoring.
Half-Hourly (HH) Meter Data
Electricity consumption data recorded every 30 minutes. Critical for accurate PV system sizing and self-consumption forecasting.
HES (Hot-Spot)
Localised panel area running hotter than surroundings, indicating cell damage or shading. Detected via thermal imaging or module-level monitoring.
HSE (Health & Safety Executive)
UK regulator with responsibility for workplace safety including asbestos handling. trained asbestos contractors required for asbestos cement removal.
HVDC (High Voltage DC)
Modern inverter operating voltage range. Higher voltages (typically 600-1500V DC) reduce DC cable losses on commercial installations.
IndexNow
Search engine indexing protocol jointly operated by Bing, Yandex, Naver, Seznam. Enables instant URL submission for indexing.
Inverter
Electronic device converting DC from solar panels to AC for grid synchronisation. Multiple manufacturers: SolarEdge, SMA, Huawei, Fronius, Goodwe, Solis.
IRR (Internal Rate of Return)
Financial metric for solar PV economic analysis. Typical 25-year IRR for UK farm rooftop installs: 13-17%.
IWA (Insurance-Backed Workmanship)
UK insurance scheme providing 10-year workmanship cover for renewable installations. Critical protection against installer insolvency.
JA Solar
Chinese tier-1 panel manufacturer (top 2 by global volume). 540W modules common on UK farm installs.
Jinko Solar
Chinese tier-1 panel manufacturer (top 3 by global volume). Strong commercial portfolio in the UK.
kWh
Kilowatt-hour. Unit of energy. Standard measurement for solar PV generation, electricity consumption, and battery storage capacity.
kWp
Kilowatt peak. Rated capacity of solar PV system at Standard Test Conditions (1000 W/m² irradiance, 25°C). Used to size systems.
LFP (Lithium Iron Phosphate)
Battery chemistry dominant on modern UK commercial solar storage. Safer and longer-cycle than older NMC chemistry. 5,000-7,000 cycle life at 90% DoD.
Lifetime IRR
Compound rate of return over the system's 25-30 year operational life. Typically 13-17% for UK farm rooftop PV.
Lightning Protection Level (LPL)
BS EN 62305 risk classification: I (highest), II, III, IV. Most UK farm installs justify LPL III or IV.
Lion Quality
UK egg assurance scheme. Major supplier programme requiring on-farm sustainability evidence including Scope 2 reduction.
Listed Building Consent
Planning consent required before any work on a Grade-listed building. Required for PV on listed agricultural buildings.
LONGi
Chinese tier-1 panel manufacturer. Industry-leading 15-year product warranty and 30-year linear performance warranty.
MC4
Industry-standard DC connector for solar panel cabling. Crimped or factory-assembled connections.
MCS Commercial Certification
Microgeneration Certification Scheme commercial certificate. UK gold standard for solar PV installers above 50 kW. Required for SEG eligibility.
MPP / MPPT
Maximum Power Point Tracking. Inverter algorithm that continuously adjusts operating point to extract maximum power from PV strings under varying conditions.
NABIM
National Association of British and Irish Millers. UK grain supplier assurance scheme.
NICEIC
UK electrical contractor certification body. NICEIC Approved Contractors authorised for commercial electrical work.
No-Export Design
PV system sized for 100% self-consumption with zero export to grid. Enables fast G99 grid connection on export-constrained networks.
NMC (Nickel Manganese Cobalt)
Older lithium battery chemistry. Largely superseded by LFP for commercial farm applications.
NVZ
Nitrate Vulnerable Zone. UK regulatory designation for nitrate-sensitive agricultural areas. Slurry management implications for dairy and pig installs.
Octopus Outgoing Agile
Variable SEG tariff that tracks wholesale electricity prices. Currently among the best SEG offers in the UK market.
Optimised String
PV system topology using module-level power optimisers (e.g., SolarEdge). Improves performance in shading conditions.
Ozev
UK government body managing electric vehicle charging grants including Workplace Charging Scheme (WCS).
Performance Ratio (PR)
Standard PV system efficiency metric. Compares actual generation against theoretical maximum for given irradiance. Year-one target 0.82-0.88 for UK farm rooftop installs.
Permitted Development
UK planning category allowing certain works without formal planning permission. Class J, Part 14 GPDO 2015 covers most farm-building rooftop PV.
PPA (Power Purchase Agreement)
Long-term contract where a third-party developer installs and owns PV on the farm's buildings, selling electricity to the farm at a discount rate.
PSDS
Public Sector Decarbonisation Scheme. Grant programme for public-sector buildings; not directly available to commercial farm projects.
PV CYCLE
European industry body for solar panel recycling. PV CYCLE UK operates collection facilities for end-of-life panels.
PVSyst
Industry-standard solar PV simulation software. Used for yield forecasting, shading analysis, financial modelling.
Q-Cells (Hanwha Q Cells)
South Korean and German tier-1 panel manufacturer. Strong low-light performance, relevant for UK installations.
Racking
Mechanical mounting system for solar panels. Major brands: Schletter, Renusol, K2 Systems.
Re-cladding
Installation of new roof cladding to replace removed asbestos cement. Profiled steel or composite panel standard.
REC Group
Norwegian/Singapore tier-1 panel manufacturer. Premium tier with 25-year product warranty.
RECC
Renewable Energy Consumer Code. Required for UK renewable installer accreditation.
Red Tractor
UK farm assurance scheme covering dairy, beef, lamb, pork, eggs, poultry, fresh produce. Increasingly references on-farm renewables.
Re-powering
Replacement of solar panels at end-of-life (typically year 25-30) while reusing racking, cabling, and structural mounts. Typical capex 50-60% of original install.
RSPCA Assured
UK animal welfare assurance scheme. References on-farm sustainability including renewables in scheme requirements.
Scope 1
Direct GHG emissions from farm operations (diesel, propane, etc.).
Scope 2
Indirect GHG emissions from purchased grid electricity. Solar PV directly reduces Scope 2.
Scope 3
Upstream and downstream GHG emissions across the supply chain. UK supermarket programmes increasingly target Scope 3 via supplier Scope 2 reduction.
SEG (Smart Export Guarantee)
UK regulatory framework requiring electricity suppliers to offer export tariffs for renewable generation. Replaces the closed FiT scheme.
SFI (Sustainable Farming Incentive)
Defra agricultural support scheme replacing BPS. Includes actions compatible with farm solar including agrivoltaic and biodiversity bundles.
Shading Analysis
Modelling of shadows on PV array from buildings, vegetation, terrain. Critical for accurate yield forecasting.
SMA Solar Technology
German tier-1 inverter manufacturer. Sunny Tripower CORE1/CORE2 ranges for commercial farm installs.
SMETS2
Second-generation UK smart meter. Required for SEG export metering on most installations.
SolarEdge
Israeli-headquartered premium inverter manufacturer. Module-level optimisers enable best-in-class shading tolerance and module-level monitoring.
Solar Energy UK
UK trade association for the solar industry. Membership signal for installer credibility.
Speakable Schema
Structured data marking content suitable for voice-search response. Improves visibility in voice search results.
SPD (Surge Protection Device)
Lightning and surge protection. Type 1 at main switchboard, Type 2 at inverter, Type 3 at sensitive equipment.
SSEN
Scottish and Southern Electricity Networks. Regional DNO covering southern England plus Highlands and Islands.
String Inverter
PV inverter connected to a string (series) of panels. Most common topology on commercial farm installs.
Sunny Portal
SMA monitoring platform. Established commercial monitoring solution.
TFA (Tenant Farmers Association)
UK tenant farmer industry body. Provides tenant-farmer-specific guidance including renewable energy projects.
Three-phase Supply
Electrical supply with three live conductors providing higher capacity than single-phase. Required for most commercial farm PV systems above 17 kW.
Tier-1 Panel Manufacturer
Industry classification of panel manufacturers based on bankability and financial stability. Top tier-1 brands: JA Solar, LONGi, Jinko, Trina, Q-Cells, REC.
Trina Solar
Chinese tier-1 panel manufacturer (top 3 by volume). Strong commercial portfolio.
TRIG
Tenancy Reform Industry Group. Provides guidance on tenant-PV installations and lease addenda for UK agricultural tenants.
TrustMark
UK government-endorsed quality scheme for tradespeople. Required for IWA workmanship warranty registration.
UKPN (UK Power Networks)
Regional DNO covering London, South East England, East Anglia.
WCS (Workplace Charging Scheme)
OZEV grant covering up to 75% of EV charger installation cost. Applicable to farm workplace charging.
WEEE Regulations
Waste Electrical and Electronic Equipment Regulations 2013. Governs end-of-life disposal of solar panels and batteries.

Independent, data-led farm solar guidance

  • Independent specialist guidance
  • Sourced 2026 rates & grant data — last reviewed July 2026