Plan for Better is Sainsbury’s published sustainability plan, and its Scope 3 targets reach its suppliers. This page explains how an on-farm array fits the Scope 1, 2 and 3 vocabulary those targets use. It makes no claim that Sainsbury’s requires, accepts or rewards farm solar, because the report we read does not say so.
What Sainsbury’s publishes
Sainsbury’s Sustainability Report 2025 (the Plan for Better report for 2024/25) sets net zero in its own operations by 2035 and its value chain by 2050, with 2030 Scope 3 cuts of 36.4% for FLAG and 50.4% for non-FLAG emissions. It reports that 39.8% of its Scope 3 emissions are covered by suppliers with SBTi-approved 1.5°C targets, and points farmers to long-term contracts. Its PV references describe its own sites; we found no mention of solar on supplier farms.
Scope 1, 2 and 3 on a farm
Supplier requests use the GHG Protocol’s three scopes. Scope 1 is direct emissions from sources a business owns or controls, such as fuel burned in its vehicles and boilers. Scope 2 is emissions from the generation of purchased electricity it consumes. Scope 3 is all other indirect emissions. A farm reports its own Scopes 1 and 2; to the retailer, the farm’s emissions sit in the retailer’s Scope 3.
What an on-farm array changes
Illustrative arithmetic: if an array lets a farm stop buying 50,000 kWh a year, the DESNZ 2026 UK electricity factor (0.13096 kg CO2e per kWh, Scope 2) gives 6,548 kg, about 6.55 tonnes CO2e. DESNZ lists transmission and distribution losses separately as Scope 3 (0.01299), so check whether a request wants them added. This is a worked example, not a forecast.
What to ask your buyer
Get these answers before you plan:
- whether the data request is contractual or voluntary;
- which reporting year and deadline apply;
- whether your figures or a retailer estimate will be used;
- whether imported, self-used and exported electricity are distinguished;
- who to contact when the portal and template disagree.
Do not size an array around a supplier scheme
A retailer’s sustainability page is not an instruction to buy panels. None of the Sainsbury’s pages cited says solar is required, accepted or rewarded. Until your buyer says otherwise in writing, plan around the farm’s own electricity use, using farm solar cost guide, grants and funding and solar panel weight and roof loading.
For the building and system, see solar panels for agricultural buildings. Suppliers to Morrisons, Waitrose and Lidl GB will find the same checklist on their pages.
| Point on this page | Source | Date |
|---|---|---|
| Net zero 2035 (operations), 2050 (value chain); 2030 Scope 3: FLAG 36.4%, non-FLAG 50.4% | Sainsbury’s Sustainability Report 2025 (pp.4, 7, 13, 30) | 2025 |
| 39.8% of Scope 3 covered by suppliers with SBTi 1.5°C targets; long-term farmer contracts | Sainsbury’s Sustainability Report 2025 (pp.4, 7, 13, 30) | 2025 |
| GHG Protocol: what the scopes mean, where purchased food sits, and the two Scope 2 methods | GHG Protocol Corporate Standard p.27, Scope 3 Standard, Scope 2 Guidance | undated; 2015 |
| DESNZ factors for UK electricity: 0.13096 kg CO2e/kWh (Scope 2), 0.01299 for T&D losses (Scope 3) | DESNZ conversion factors 2026 | 11 Jun 2026, updated 31 Jul 2026 |
Common questions
Does Sainsbury’s require farm solar?
Nothing in the Sustainability Report 2025 says so. It points to supplier targets and long-term contracts for farmers. Check your supply agreement and ask your buyer in writing.
Is an array Scope 1, 2 or 3 for my farm?
Mostly Scope 2: under the GHG Protocol that scope is purchased electricity the business consumes, so self-used array kWh replace purchases and exports do not. Fuel you burn on the farm is Scope 1.
Do exported kWh reduce my Scope 2 figure?
Not on the GHG Protocol definition, which limits Scope 2 to purchased electricity the business consumes. Ask your Sainsbury’s buyer whether exports should be recorded separately.
Other UK supermarket and processor supplier pages
See our coverage of the major UK retailer and processor supplier schemes: