Solar + Battery Storage for UK Farms

How to combine solar PV with complementary technology for UK farms. Solar + Battery Bundle scope, economics, delivery.

  • Independent guidance

What the Solar + Battery Bundle delivers

Adding battery storage to a farm solar install transforms the economics for arable farms with seasonal grain-drying peaks, dairy parlours with critical-load resilience needs, and any farm planning fleet electrification within 3 years.

Standard Solar + Battery Bundle scope

Standard solar+battery bundle: 200-500 kW PV; 100-300 kWh LFP battery (BYD Battery-Box Premium HV typical); hybrid inverter or AC-coupled architecture (depending on retrofit vs new build); intelligent battery management routing summer PV excess to autumn drying or evening loads.

Economics in 2026 prices

For a typical install: 300 kW PV + 200 kWh battery. Capex roughly £240,000 + £100,000 = £340,000. 100% AIA across both delivers approximately £85,000 year-one tax saving. Annual savings: PV generation £55,000 + time-shift value £8,000 + demand-charge savings £6,000 = £69,000. Simple payback 4.9 years after AIA.

Why specify the parts together

Specifying the parts together keeps one G99 grid connection application, one monitoring portal and one set of warranties. Ask each installer to price the combined scope and the parts separately so you can compare.

Before you ask for quotes

Gather your half-hourly meter data and a short brief on your goals: fleet electrification plans, supplier-audit requirements, capital position and planned building work. Ask each installer for a desk feasibility study and what it costs. This site is independent guidance, not an installer: send your details through the form and we reply by email.

Common questions

What's the total capex for a typical Solar + Battery Bundle?

Varies by farm scale. 300 kW PV + 200 kWh battery. . A good installer delivers fixed-price proposals of receiving meter data.

Can the Solar + Battery Bundle be financed?

Yes — asset finance over 5-10 years for the entire bundle is typically EBITDA-positive from month one for installs with strong daytime baseload. PPA available for systems above 250 kW. Capital purchase with 100% AIA for incorporated farms.

How long does the bundle take from contract to commissioning?

Most bundles complete in 6-9 months from contract signature. The longest item is typically DNO G99 grid connection (6-14 months on most rural feeders, running in parallel). Physical install on-site is typically 4-8 weeks.

Is the bundle eligible for AIA tax relief?

Plant and machinery components (panels, inverters, batteries, EV chargers, heat pump units) are 100% AIA eligible up to the £1m annual cap. Building fabric (re-roofing, structural reinforcement) typically isn't but may have other tax treatment. A good installer provides itemised invoices supporting clean accountant claim.

Independent, data-led farm solar guidance

  • Independent specialist guidance
  • Sourced 2026 rates & grant data — last reviewed July 2026