Solar on a tenanted farm when the landlord is a trust: what to ask

A sourced checklist for tenant farmers: the tenancy statutes, the roof and the written request. It makes no claim about Wellcome Trust’s own process.

  • Independent guidance
  • Sources checked 20 Oct 2026

Wellcome has said it owns a farming business. This page makes no claim about any Wellcome tenant solar policy, because we found none. It covers the law for a tenancy in England and the questions to ask when the landlord is a trust or other institution.

What Wellcome publishes

In a press release of 3 August 2014, Wellcome announced it had bought the Co-operative Group’s farms business for its endowment. The business, now trading as Farmcare Trading Ltd, included about 16,000 hectares, 15 farms with three pack houses and over 100 residential properties. Tenants are mentioned only in passing and renewable energy not at all.

Which law governs your tenancy

Two Acts matter: the Agricultural Holdings Act 1986 (the 1986 Act), covering many older tenancies, and the Agricultural Tenancies Act 1995 (the 1995 Act), covering farm business tenancies. Both are marked on legislation.gov.uk as extending to England and Wales. Confirm which governs your agreement before drafting a request, because their rules on fixtures and compensation differ.

Removing what you fix to the building

Under section 10 of the 1986 Act a tenant can remove fixtures and buildings they put on the holding during the tenancy or within two months after it ends, once rent is paid and on at least one month’s written notice; the landlord can counter-notice to buy at a fair value to an incoming tenant. Section 8 of the 1995 Act has no notice step in its text but lists its own exclusions.

Consent and compensation

For a farm business tenancy, section 16 of the 1995 Act gives compensation at the end of the tenancy for a tenant’s improvement, but not for a physical improvement that has been removed. Section 17 makes the landlord’s written consent a condition; it can sit in the tenancy or be given separately, and may depend on an agreed change to the terms.

Who repairs the roof under the array

Panels need a sound roof and a structure that can carry them. Find out from the tenancy who must repair or replace the roof (the 1973 repairing regulations, as made, put roof replacement mainly on the landlord of an agricultural holding, with some tenant duties, unless the agreement differs) and get a structural assessment first; see solar panel weight and roof loading. For asbestos cement sheets, overclad or strip an asbestos cement farm roof compares the options.

What to put in the written request

Before approaching the land agent, assemble:

Tenants of Bedford Estates, Buccleuch and the Church Commissioners will find the same checklist on their pages. For the building and system, see solar panels for agricultural buildings; for wider background, tenant farmer solar and landlord consent.

Abbreviations: 1995 Act = Agricultural Tenancies Act 1995; 1986 Act = Agricultural Holdings Act 1986. All sources checked 20 October 2026.
Point on this pageSourceDate
Bought Co-op farms business (Farmcare); about 16,000 ha, 15 farms; tenants only in passingWellcome press release, Co-operative Group farms business3 Aug 2014
Right to remove a tenant’s fixtures and buildings; exclusions and conditions apply1995 Act s.8, 1986 Act s.10current text
Written consent as a condition of compensation for improvements1995 Act s.16, s.17current text
Who repairs and replaces roofs under the 1973 regulationsSI 1973/1473, Fixed Equipment Regulations1973, as made

Common questions

How do I find out who my landlord’s agent is?

Look for the landlord and agent named in the tenancy agreement and rent correspondence. If neither is clear, ask in writing before you send anything.

Does Wellcome Trust publish a solar policy for tenants?

Nothing on the pages cited describes one for Wellcome Trust (checked 20 October 2026). Ask the land agent whether any standard terms exist and keep the reply.

Who repairs the roof before panels go on?

Check the tenancy first. For an agricultural holding the 1973 regulations, as made, make the landlord mainly responsible for roof repairs and replacements, with some tenant duties, unless the agreement says otherwise; asbestos cement roofs need the separate guide first.

Other estate-landlord and tenant-farmer pages

See the wider UK estate-landlord and tenant-farmer solar resource set:

Independent, data-led farm solar guidance

  • Independent specialist guidance
  • Sourced 2026 rates & grant data — last reviewed July 2026