Solar Panels on Farm Buildings in Wales

Roof rules, grid, rates and funding for Welsh barns, sheds and dairy units, checked against primary sources on 3 November 2026.

  • Independent guidance
  • Checked 3 November 2026

What is different for a farm building in Wales

Wales has its own planning order, its own rates rules and, since 1 January 2026, its own farm support under the Sustainable Farming Scheme. Only the tax reliefs and the Great Britain grid code are shared with England. This page covers those differences for barns, livestock sheds, dairy units and grain stores.

Planning: Part 43, not the English Class J

Wales did not adopt England's Part 14 changes. Rooftop solar on a non-domestic building falls under Part 43 Class A of the Town and Country Planning (General Permitted Development) Order 1995 as it applies in Wales. Part 43 was inserted in 2012 and amended in 2019. Its conditions:

  • no more than 20 cm proud of a wall or a pitched roof;
  • no more than 1 m above a flat roof, and not within 1 m of the roof edge or a wall and roof junction;
  • on article 1(5) land, which includes conservation areas and National Parks, and on World Heritage Sites, not on a wall or roof slope that fronts a highway;
  • not within the curtilage of a listed building or on a scheduled monument;
  • since 2019, not within 3 km of an aerodrome, with a condition on glint and glare.

Read the order's own conditions for your building rather than a summary, and ask the planning authority early if the roof is large or the site is sensitive. A stand-alone array falls under Class B: one per curtilage, 9 m² of panels at most, no more than 4 m high, at least 5 m from the boundary and no dimension over 3 m. Anything bigger needs planning permission.

Grid: NGED in the south, SP Manweb in the north

National Grid Electricity Distribution (formerly Western Power Distribution) runs the South Wales network: about 1.2 million customers from Pembrokeshire to Monmouth, north to Aberaeron and Rhayader. SP Manweb, part of SP Energy Networks, runs North Wales and Merseyside. The boundary through mid-Wales is not something to guess: the operator is named in your connection paperwork. Any array above 16 A per phase needs an approved G99 application before it is energised. A Transmission Impact Assessment is needed only above 5 MW in England and Wales since the 2025 change (CMP446). The process is on the NGED and SPEN G99 guides.

Yield on a Welsh shed roof

PVGIS gives these long-term annual yields per kWp:

Point10° south (kWh/kWp)Optimal tilt (kWh/kWp)
Cardiff9461,044
Swansea9211,016
Wrexham876970

South Wales has some of the better yields in Great Britain, but an upland site or an east-west roof will come out lower. Run PVGIS for your own grid reference.

Business rates: renewables plant excepted to 2035

Welsh Statutory Instrument 2023/1229 excepts plant used to generate or store power mainly or wholly from listed renewable sources, including photovoltaics, from valuation from 1 April 2024 until before 1 April 2035. Confirm how it applies to your building with the Valuation Office Agency.

Funding in Wales: what is open and what is not

  • Sustainable Farming Scheme: no solar items. The scheme started on 1 January 2026. Its 2026 Optional and Collaborative capital lists, published on 23 March 2026, contain no solar PV, renewables, battery or energy-efficiency items.
  • Ynni Cymru: closed. Round 3 closed at 12pm on 21 May 2026, with no further round announced. It required low-carbon heat as well as generation; a solar and battery project on its own was ineligible.
  • Development Bank of Wales Sustainable Agriculture Loan: a loan, not a grant. Launched on 1 July 2026 at a 3% fixed rate, from £25,000 to £1m over up to 15 years with a six-month repayment holiday. It covers renewable energy generation for on-farm use and energy storage, for farms with at least 3 ha in Wales or 550 standard labour hours. Its page still says "register interest", so check whether it is taking applications.
  • Development Bank of Wales Green Business Loan Scheme: live. It names solar PV among eligible measures, for Wales-based businesses trading for at least two years with a set of filed accounts. It also offers a grant towards an energy audit: up to 50% of the cost, to a maximum of £10,000.
  • Smart Export Guarantee: applies, as across Great Britain, for installations up to 5 MW.
  • Tax: UK-wide. 100% Annual Investment Allowance on the PV plant (special-rate), then the 50% special-rate first-year allowance; 20% VAT on a farm business building, reclaimable if you are VAT-registered.

The loans are described for information only. This site does not arrange finance or pass details to lenders. Realistic expectation: no grant pays for solar on a Welsh farm-building roof today. Compare the routes on the grants and funding guide.

Welsh area pages

Solar in Wales in numbers

Wales had just over 1.4 GW of solar PV at the end of 2024, generating about 1.3 TWh. 151 MW was added in 2024 across just under 16,000 projects, and Powys had the most new solar installations, about 1,478 (Energy Generation and Use in Wales, August 2026).

Sources

Each figure above was checked against these primary sources on 3 November 2026. Schemes and tariffs change, so read the current page before you rely on one.

Common questions

Do I need planning permission for solar on a farm building in Wales?

Often not for a roof array, but the Welsh rules apply, not the English ones. Part 43 Class A of the Welsh General Permitted Development Order allows rooftop solar on a non-domestic building subject to its conditions: no more than 20 cm proud of a pitched roof, 1 m above a flat roof, at least 1 m from the roof edge, not within a listed curtilage, not fronting a highway in a conservation area or National Park, and not within 3 km of an aerodrome. A stand-alone array above 9 m² needs planning permission.

Is there a grant for solar panels on farm buildings in Wales?

No grant was open for farm-building solar when checked on 3 November 2026. The Sustainable Farming Scheme's 2026 capital lists contain no solar items and Ynni Cymru round 3 closed on 21 May 2026. The farm-specific route is a loan: the Development Bank of Wales Sustainable Agriculture Loan at 3% fixed, whose page still says register interest. This site describes it for information only and does not arrange finance.

Which network operator covers my Welsh farm?

National Grid Electricity Distribution in South Wales, from Pembrokeshire to Monmouth and north to Aberaeron and Rhayader; SP Manweb in North Wales. Check the operator named in your connection paperwork rather than guessing the boundary in mid-Wales.

Does the Smart Export Guarantee apply in Wales?

Yes. The Smart Export Guarantee applies across Great Britain, so a Welsh farm array up to 5 MW can earn an export tariff from a licensed supplier. Tariffs vary widely, so compare current offers.

REGIONAL FIRMS · SEO DONS CLIENTS

Regional installers in this area

Working farm solar projects often benefit from a local electrical or renewables specialist alongside the main installer. The regional firms listed here operate in this area — check each one against the MCS register and ask for references before you engage them.

FLD Electrical

Bridgend area

Bridgend & South Wales

South Wales electrical and renewables specialist covering Bridgend, the Vale of Glamorgan, and the wider Welsh dairy and livestock farming region.

Independent, data-led farm solar guidance

  • Independent specialist guidance
  • Sourced 2026 rates & grant data — last reviewed July 2026