solar panels for farm buildings in Leicester

Serving Leicester and the wider Leicestershire area, including Loughborough, Hinckley, Coalville.

Why solar PV makes sense for farm buildings near Leicester

Leicestershire and Rutland together represent one of England’s most varied farm-building portfolios. Dairy parlours dominate the Vale of Belvoir; large arable barns and grain stores cluster across east Leicestershire and Rutland; and the wider region hosts significant pig and poultry infrastructure serving Midlands and London markets. The Leicester region’s agricultural buildings — dairy parlours and livestock sheds across Leicestershire, Rutland, Vale of Belvoir, south Nottinghamshire; grain stores and arable barns on the more productive land; and the wider mix of poultry, pig, polytunnel and farm-workshop stock — represent one of the largest under-utilised commercial roof opportunities in the East Midlands commercial property market.

Leicester City Council has set a 2030 net zero target. Leicester’s Climate Action Plan provides the framework, and Leicester operates a Sustainable Procurement Strategy that favours suppliers with on-site renewables.

Leicester’s agricultural geography — where farm-building solar makes the most sense

Leicestershire, rutland, vale of belvoir, south nottinghamshire together form the working agricultural hinterland that supports Leicester’s rural economy. Within this hinterland, the buildings most commonly suited to rooftop PV are: dairy and beef across the Vale of Belvoir, arable in Rutland and east Leicestershire, intensive pig and poultry across the region. Most farm clients in the region have multi-building holdings — a typical Leicestershire farm of 250–1,200 acres carries between three and twelve farm buildings of varying age, condition and use.

Planning and policy for Leicester farm-building solar

Leicester City Council’s 2030 net zero commitment, framed under Leicester’s Climate Action Plan, sets the local policy direction. For rooftop PV on agricultural buildings, the relevant national framework is Class J, Part 14 of the Town and Country Planning (General Permitted Development) (England) Order 2015 — permitted development applies in most cases, removing the need for full planning permission. Class J, Part 14 covers PV on agricultural buildings of any size, subject to height and roof-plane limits that almost all modern farm buildings comfortably satisfy.

Exceptions to permitted development on the Leicester East Midlands farm-building stock are typically: (1) listed agricultural buildings — historically more common in Leicestershire than people realise, since former farm complexes converted to residential listings sometimes retain listed barns or cart sheds; (2) farm buildings within Leicester’s green belt or designated AONB land where Article 4 directions may apply; (3) ground-mount installations above 9m × 9m × 4m height; and (4) installations within the curtilage of listed farm dwellings (often the original farmhouse). Where any of these applies, any planning consultation with Leicester City Council is normally handled by your installer as part of project delivery, so confirm the requirements with the council.

Leicester operates a Sustainable Procurement Strategy that favours suppliers with on-site renewables.

What farm-building solar costs around Leicester

There is no verified area price for farm-building solar, and none is claimed here. It covers MCS installations up to 50 kW across all building types, so larger farm systems are priced from written quotes. The farm solar cost guide sets out the series and the items that move a farm quote: roof condition and access, the three-phase connection and any G99 works, cable runs between buildings, and the inverter and module specification.

Capital cost is paid back through the electricity not bought and the export rate on the rest, so the saving comes from the farm’s own half-hourly data and tariff, not an area average. Tax relief for the capital spend is covered on the grants and funding guide.

Farm building types the installer delivers across the Leicester region

The Leicester-region agricultural building stock spans the full range of UK farm infrastructure. The building types this guide covers:

Most Leicester-region farms have a mix of building types — a typical 600-acre family farm might run a 60-cow dairy parlour, two livestock buildings of different ages, a grain store, an equestrian or general-purpose workshop, and a fleet shed.

Other commercial farming areas adjoining Leicester

The Leicester agricultural region does not stop at the city boundary. Nearby areas with their own pages or farming context:

Questions about farm-building solar around Leicester

Can solar go on an asbestos cement farm roof? Not directly: installers will not normally fix through asbestos cement sheets, so the roof is replaced or overclad first. HSE says most work on asbestos cement is non-licensed provided the people doing it are informed, instructed and trained, and its task sheet A14 asks whether the sheets can be overlaid with non-asbestos material instead of removed. See overclad or strip an asbestos cement farm roof and solar panels on asbestos cement farm roofs.

Is planning permission needed? Rooftop solar on agricultural buildings is often permitted development under Class J of Part 14 of the General Permitted Development Order 2015, subject to its conditions, and listed buildings, conservation areas and designated landscapes need separate consent. The limits are set out on planning permission for solar on farm buildings.

How long does a grid connection take? The distribution network operator sets its own G99 study timescales and any reinforcement cost, so ask it for current figures in writing. The process is covered in DNO grid connection for rural farm solar.

Does the roof need a structural check? Yes. The module weights, the 15% loading test in Approved Document A and the exemption many agricultural buildings enjoy are set out in solar panel weight and roof loading on farm buildings.

Tell us about your Leicester-area farm buildings

Send your details through the quote form and we reply by email. This site is independent guidance, not an installer: the form is the way to describe the buildings, their roofs and the electricity they use.

Send your details

This page covers solar panels for agricultural buildings across Leicester and Leicestershire. For how to check and compare any installer, see the guide to UK agricultural solar panel installers.

Postcodes covered in Leicester

  • LE1
  • LE2
  • LE3
  • LE4
  • LE5
  • LE6
  • LE7
  • LE8
  • LE9
  • LE10
  • LE17
  • LE18
  • LE19

Farm building types covered near Leicester

Your installer delivers every farm-building solar PV sub-type across the Leicestershire agricultural hinterland. Click a building type for full system sizing, payback economics, and a representative install.

Service × Leicester — specific building-type pages

Detailed landing pages for the specific building you're considering, with Leicester-specific cost, payback, and Leicester City Council planning context:

Other area pages near Leicester

REGIONAL FIRMS · SEO DONS CLIENTS

Regional installers in this area

Working farm solar projects often benefit from a local electrical or renewables specialist alongside the main installer. The regional firms listed here operate in this area — check each one against the MCS register and ask for references before you engage them.

EC Eco Energy

Hertfordshire / Leicester

Hertfordshire & East Midlands

Dual-region renewables provider covering Hertfordshire commercial and East Midlands rural sectors with strong dairy and arable portfolio.

Carbon Legacy

East Leake, Nottinghamshire

Nottinghamshire & East Midlands

Nottinghamshire-based carbon-reduction specialist providing solar PV, heat pump and broader decarbonisation services to East Midlands farms.

Energy Concerns

Thorpe Astley, Leicester

Leicestershire & East Midlands

Leicester-based energy specialist with East Midlands commercial and agricultural renewables portfolio.

Independent, data-led farm solar guidance

  • Independent specialist guidance
  • Sourced 2026 rates & grant data — last reviewed July 2026