Skip to main content
Solar panels on farm buildings in Devon, Devon
Serving Devon & Devon

Solar Panels for Farm Buildings in Devon

MCS-certified agricultural solar installations for Devon's farming community. Reduce energy costs by up to 65% with a system sized for your operation.

189+

Projects in South West England

11

Years Serving Devon

40–65%

Typical Energy Cost Reduction

25yr

Panel Performance Warranty

Agricultural Solar Panel Specialists in Devon

Supporting Devon's agricultural heritage with solar panel installations for farm buildings across the county, from dairy farms on Dartmoor to mixed farming operations in the South Hams. With 189+ completed installations across South West England and 11 years serving Devon farms, our team understands the specific energy demands and building characteristics of this region.

Devon's agricultural community spans Dairy farming, Beef cattle, Sheep farming, Mixed farming operations — each with distinct energy profiles and building types. Our surveyors assess roof orientation, structural load capacity, and DNO connection constraints before designing a system optimised for your operation. We install on steel portal-frame buildings, timber-framed barns, concrete-block structures, and older brick-built farm buildings across Devon.

Devon is accessible via M5 motorway, Exeter St Davids Station, Exeter Airport, allowing our installation crews to reach farms across Devon efficiently. We coordinate with local Distribution Network Operators to manage grid connection applications, and handle all MCS documentation required for Smart Export Guarantee eligibility.

Why Devon Farmers Choose Us

  • MCS-certified installers — required for Smart Export Guarantee eligibility
  • 189+ completed projects across South West England
  • Specialists in Dairy farming and Beef cattle solar installations
  • In-house structural surveyors familiar with Devon building stock
  • PPA financing available — zero upfront cost, immediate savings

How Solar Works for Dairy farming Operations in Devon

Dairy operations in Devon are among the highest electricity consumers in UK agriculture — bulk tank refrigeration, milking equipment, and parlour lighting run consistently through daylight hours, creating the ideal load profile for solar generation. A correctly sized system can displace 60–80% of your electricity demand directly, with surplus fed to the grid under the Smart Export Guarantee.

Typical System Sizes for Devon Farm Buildings

Operation Size System Size Est. Annual Generation Indicative Bill Savings
Small — single building 30–50 kWp 27,000–45,000 kWh/yr £7,000–£12,000/yr
Medium — 2–3 buildings 80–120 kWp 72,000–108,000 kWh/yr £18,000–£28,000/yr
Large — multi-building 150–250 kWp 135,000–225,000 kWh/yr £35,000–£58,000/yr

Estimates based on average UK irradiance figures at 900 kWh/kWp/year and electricity at 25p/kWh. Actual figures vary by orientation, shading, and tariff. Use our calculator for a site-specific estimate.

Government Grants for Devon Farmers

Devon farmers can apply for the Farming Investment Fund (FIF) Productivity and Infrastructure Grant, which covers eligible solar equipment. Enhanced Capital Allowances allow full first-year tax deduction on qualifying installations. The Smart Export Guarantee provides ongoing income for surplus electricity. Our team includes a dedicated grant specialist who reviews eligibility and prepares funding applications for every client — at no additional charge. Ask about grants during your free survey.

Local Knowledge for Devon Farms

Devon's agricultural landscape includes Dairy farming, Beef cattle, Sheep farming, Mixed farming operations spread across diverse terrain. Our South West England team has built deep expertise in the planning requirements, DNO constraints, and building types specific to Devon.

Regional Planning Expertise

Familiar with Devon Council agricultural planning rules and permitted development rights for solar on farm buildings

DNO Grid Connections

Experienced managing grid connection applications with South West England distribution network operators for agricultural systems

Financing Options

PPA, agricultural loans, and outright purchase options tailored for Devon farm businesses of all sizes

MCS Certified

Full MCS certification ensures your Devon installation qualifies for the Smart Export Guarantee and any applicable government incentives

MCS-certified solar panel installation on agricultural building in Devon

4.9/5 Rating

189+ South West England installations

Areas We Cover Around Devon

We serve the entire Devon region and surrounding areas. Our installation teams travel across South West England to reach your farm.

Primary Service Area

  • Devon and immediate surrounds
  • All of Devon
  • Rural parishes and agricultural estates
  • Market towns across South West England

Local Landmarks & Areas

  • Near Dartmoor National Park
  • Near Exeter Cathedral
  • Near Jurassic Coast

We cover all areas within 80km of Devon. For farms further afield in South West England, contact us — we regularly serve sites across the wider region.

Nearby Counties We Also Cover

Our South West England teams also serve farms across these neighbouring areas:

Solar Panel FAQs for Devon Farm Owners

Common questions from farmers across the region about agricultural solar installations.

Power Purchase Agreement Available for Devon Farms

No upfront capital required. We install and own the system — you buy the electricity at a fixed rate below your current tariff. Typical savings start from day one.

Free Site Survey for Devon Farms

Our Devon surveyors will visit your farm, assess your buildings, and produce a detailed proposal showing projected generation, savings, payback period, and financing options — at no cost and no obligation.

01234 567890 info@solarpanelsforfarmbuildings.co.uk
Covering Devon, Devon and surrounding areas within South West England

What's Included in Your Free Assessment

  • Roof structural survey and orientation analysis
  • Energy consumption review and solar offset modelling
  • System size recommendations with ROI projections
  • DNO pre-application check for Devon
  • Financing options including PPA with £0 upfront

Get in Touch

Solar panels on farm building

Start Saving on Farm Energy Costs in Devon

Join 189+ farms across South West England that have cut their electricity bills with agricultural solar installations.