Skip to main content
Solar panels on farm buildings in Somerset, Somerset
Serving Somerset & Somerset

Solar Panels for Farm Buildings in Somerset

MCS-certified agricultural solar installations for Somerset's farming community. Reduce energy costs by up to 65% with a system sized for your operation.

145+

Projects in South West England

10

Years Serving Somerset

40–65%

Typical Energy Cost Reduction

25yr

Panel Performance Warranty

Agricultural Solar Panel Specialists in Somerset

Supporting Somerset's diverse agricultural sector with solar panel installations for farm buildings, from dairy operations in the Somerset Levels to mixed farming across the county. With 145+ completed installations across South West England and 10 years serving Somerset farms, our team understands the specific energy demands and building characteristics of this region.

Somerset's agricultural community spans Dairy farming, Mixed agriculture, Livestock farming, Cider production operations — each with distinct energy profiles and building types. Our surveyors assess roof orientation, structural load capacity, and DNO connection constraints before designing a system optimised for your operation. We install on steel portal-frame buildings, timber-framed barns, concrete-block structures, and older brick-built farm buildings across Somerset.

Somerset is accessible via M5 motorway, Taunton Station, Bristol Airport, allowing our installation crews to reach farms across Somerset efficiently. We coordinate with local Distribution Network Operators to manage grid connection applications, and handle all MCS documentation required for Smart Export Guarantee eligibility.

Why Somerset Farmers Choose Us

  • MCS-certified installers — required for Smart Export Guarantee eligibility
  • 145+ completed projects across South West England
  • Specialists in Dairy farming and Mixed agriculture solar installations
  • In-house structural surveyors familiar with Somerset building stock
  • PPA financing available — zero upfront cost, immediate savings

How Solar Works for Dairy farming Operations in Somerset

Dairy operations in Somerset are among the highest electricity consumers in UK agriculture — bulk tank refrigeration, milking equipment, and parlour lighting run consistently through daylight hours, creating the ideal load profile for solar generation. A correctly sized system can displace 60–80% of your electricity demand directly, with surplus fed to the grid under the Smart Export Guarantee.

Typical System Sizes for Somerset Farm Buildings

Operation Size System Size Est. Annual Generation Indicative Bill Savings
Small — single building 30–50 kWp 27,000–45,000 kWh/yr £7,000–£12,000/yr
Medium — 2–3 buildings 80–120 kWp 72,000–108,000 kWh/yr £18,000–£28,000/yr
Large — multi-building 150–250 kWp 135,000–225,000 kWh/yr £35,000–£58,000/yr

Estimates based on average UK irradiance figures at 900 kWh/kWp/year and electricity at 25p/kWh. Actual figures vary by orientation, shading, and tariff. Use our calculator for a site-specific estimate.

Government Grants for Somerset Farmers

Somerset farmers can apply for the Farming Investment Fund (FIF) Productivity and Infrastructure Grant, which covers eligible solar equipment. Enhanced Capital Allowances allow full first-year tax deduction on qualifying installations. The Smart Export Guarantee provides ongoing income for surplus electricity. Our team includes a dedicated grant specialist who reviews eligibility and prepares funding applications for every client — at no additional charge. Ask about grants during your free survey.

Local Knowledge for Somerset Farms

Somerset's agricultural landscape includes Dairy farming, Mixed agriculture, Livestock farming, Cider production operations spread across diverse terrain. Our South West England team has built deep expertise in the planning requirements, DNO constraints, and building types specific to Somerset.

Regional Planning Expertise

Familiar with Somerset Council agricultural planning rules and permitted development rights for solar on farm buildings

DNO Grid Connections

Experienced managing grid connection applications with South West England distribution network operators for agricultural systems

Financing Options

PPA, agricultural loans, and outright purchase options tailored for Somerset farm businesses of all sizes

MCS Certified

Full MCS certification ensures your Somerset installation qualifies for the Smart Export Guarantee and any applicable government incentives

MCS-certified solar panel installation on agricultural building in Somerset

4.9/5 Rating

145+ South West England installations

Areas We Cover Around Somerset

We serve the entire Somerset region and surrounding areas. Our installation teams travel across South West England to reach your farm.

Primary Service Area

  • Somerset and immediate surrounds
  • All of Somerset
  • Rural parishes and agricultural estates
  • Market towns across South West England

Local Landmarks & Areas

  • Near Glastonbury Tor
  • Near Wells Cathedral
  • Near Cheddar Gorge

We cover all areas within 80km of Somerset. For farms further afield in South West England, contact us — we regularly serve sites across the wider region.

Nearby Counties We Also Cover

Our South West England teams also serve farms across these neighbouring areas:

Solar Panel FAQs for Somerset Farm Owners

Common questions from farmers across the region about agricultural solar installations.

Power Purchase Agreement Available for Somerset Farms

No upfront capital required. We install and own the system — you buy the electricity at a fixed rate below your current tariff. Typical savings start from day one.

Free Site Survey for Somerset Farms

Our Somerset surveyors will visit your farm, assess your buildings, and produce a detailed proposal showing projected generation, savings, payback period, and financing options — at no cost and no obligation.

01234 567890 info@solarpanelsforfarmbuildings.co.uk
Covering Somerset, Somerset and surrounding areas within South West England

What's Included in Your Free Assessment

  • Roof structural survey and orientation analysis
  • Energy consumption review and solar offset modelling
  • System size recommendations with ROI projections
  • DNO pre-application check for Somerset
  • Financing options including PPA with £0 upfront

Get in Touch

Solar panels on farm building

Start Saving on Farm Energy Costs in Somerset

Join 145+ farms across South West England that have cut their electricity bills with agricultural solar installations.