Solar Panels for Farm Buildings in Leicester
MCS-certified agricultural solar installations for Leicestershire's farming community. Reduce energy costs by up to 65% with a system sized for your operation.
82+
Projects in East Midlands
10
Years Serving Leicestershire
40–65%
Typical Energy Cost Reduction
25yr
Panel Performance Warranty
Agricultural Solar Panel Specialists in Leicester
Supporting Leicester and Leicestershire's agricultural community with solar panel installations for farm buildings, specializing in dairy farms and mixed agricultural operations. With 82+ completed installations across East Midlands and 10 years serving Leicestershire farms, our team understands the specific energy demands and building characteristics of this region.
Leicester's agricultural community spans Dairy farming, Mixed agriculture, Livestock operations operations — each with distinct energy profiles and building types. Our surveyors assess roof orientation, structural load capacity, and DNO connection constraints before designing a system optimised for your operation. We install on steel portal-frame buildings, timber-framed barns, concrete-block structures, and older brick-built farm buildings across Leicestershire.
Leicester is accessible via M1 and M69 motorways, Leicester Station, East Midlands Airport, allowing our installation crews to reach farms across Leicestershire efficiently. We coordinate with local Distribution Network Operators to manage grid connection applications, and handle all MCS documentation required for Smart Export Guarantee eligibility.
Why Leicestershire Farmers Choose Us
- MCS-certified installers — required for Smart Export Guarantee eligibility
- 82+ completed projects across East Midlands
- Specialists in Dairy farming and Mixed agriculture solar installations
- In-house structural surveyors familiar with Leicestershire building stock
- PPA financing available — zero upfront cost, immediate savings
How Solar Works for Dairy farming Operations in Leicester
Dairy operations in Leicester are among the highest electricity consumers in UK agriculture — bulk tank refrigeration, milking equipment, and parlour lighting run consistently through daylight hours, creating the ideal load profile for solar generation. A correctly sized system can displace 60–80% of your electricity demand directly, with surplus fed to the grid under the Smart Export Guarantee.
Typical System Sizes for Leicestershire Farm Buildings
| Operation Size | System Size | Est. Annual Generation | Indicative Bill Savings |
|---|---|---|---|
| Small — single building | 30–50 kWp | 27,000–45,000 kWh/yr | £7,000–£12,000/yr |
| Medium — 2–3 buildings | 80–120 kWp | 72,000–108,000 kWh/yr | £18,000–£28,000/yr |
| Large — multi-building | 150–250 kWp | 135,000–225,000 kWh/yr | £35,000–£58,000/yr |
Estimates based on average UK irradiance figures at 900 kWh/kWp/year and electricity at 25p/kWh. Actual figures vary by orientation, shading, and tariff. Use our calculator for a site-specific estimate.
Government Grants for Leicester Farmers
Leicestershire farmers can apply for the Farming Investment Fund (FIF) Productivity and Infrastructure Grant, which covers eligible solar equipment. Enhanced Capital Allowances allow full first-year tax deduction on qualifying installations. The Smart Export Guarantee provides ongoing income for surplus electricity. Our team includes a dedicated grant specialist who reviews eligibility and prepares funding applications for every client — at no additional charge. Ask about grants during your free survey.
Solar Panel Services for Farm Buildings Near Leicester
We install solar on all types of agricultural buildings across Leicestershire. Select the service most relevant to your operation.
Dairy Farm Solar — Leicester
Milking parlour and dairy barn solar for Leicestershire dairy farmers. Power refrigeration, cooling, and lighting.
View serviceGrain Store Solar — Leicester
Offset grain drying and storage energy costs with roof-mounted solar on your Leicester grain stores.
View serviceLivestock Building Solar
Ventilation, heating, and lighting systems for livestock buildings across Leicestershire.
View serviceCattle Shed Solar
Solar solutions for beef and dairy cattle housing. Reduce winter energy bills across Leicester farms.
View servicePoultry House Solar
High-consumption poultry operations in Leicestershire benefit most from solar. Typical savings: 40–65%.
View serviceBarn Solar Panels
General-purpose farm barn installations across Leicester and Leicestershire.
View serviceLocal Knowledge for Leicestershire Farms
Leicester's agricultural landscape includes Dairy farming, Mixed agriculture, Livestock operations operations spread across diverse terrain. Our East Midlands team has built deep expertise in the planning requirements, DNO constraints, and building types specific to Leicestershire.
Regional Planning Expertise
Familiar with Leicestershire Council agricultural planning rules and permitted development rights for solar on farm buildings
DNO Grid Connections
Experienced managing grid connection applications with East Midlands distribution network operators for agricultural systems
Financing Options
PPA, agricultural loans, and outright purchase options tailored for Leicestershire farm businesses of all sizes
MCS Certified
Full MCS certification ensures your Leicester installation qualifies for the Smart Export Guarantee and any applicable government incentives
4.9/5 Rating
82+ East Midlands installations
Areas We Cover Around Leicester
We serve the entire Leicestershire region and surrounding areas. Our installation teams travel across East Midlands to reach your farm.
Primary Service Area
- Leicester and immediate surrounds
- All of Leicestershire
- Rural parishes and agricultural estates
- Market towns across East Midlands
Local Landmarks & Areas
- Near Leicester Cathedral
- Near King Richard III Centre
- Near National Space Centre
We cover all areas within 80km of Leicester. For farms further afield in East Midlands, contact us — we regularly serve sites across the wider region.
Nearby Counties We Also Cover
Our East Midlands teams also serve farms across these neighbouring areas:
Solar Panel FAQs for Leicester Farm Owners
Common questions from farmers across the region about agricultural solar installations.
Power Purchase Agreement Available for Leicester Farms
No upfront capital required. We install and own the system — you buy the electricity at a fixed rate below your current tariff. Typical savings start from day one.
Free Site Survey for Leicester Farms
Our Leicestershire surveyors will visit your farm, assess your buildings, and produce a detailed proposal showing projected generation, savings, payback period, and financing options — at no cost and no obligation.
What's Included in Your Free Assessment
- Roof structural survey and orientation analysis
- Energy consumption review and solar offset modelling
- System size recommendations with ROI projections
- DNO pre-application check for Leicestershire
- Financing options including PPA with £0 upfront
Get in Touch
Start Saving on Farm Energy Costs in Leicester
Join 82+ farms across East Midlands that have cut their electricity bills with agricultural solar installations.