Solar Panels for Farm Buildings in Pembrokeshire
MCS-certified agricultural solar installations for Pembrokeshire's farming community. Reduce energy costs by up to 65% with a system sized for your operation.
56+
Projects in Wales
6
Years Serving Pembrokeshire
40–65%
Typical Energy Cost Reduction
25yr
Panel Performance Warranty
Agricultural Solar Panel Specialists in Pembrokeshire
Supporting Pembrokeshire's agricultural community with solar panel installations for farm buildings, specializing in dairy farming, mixed agriculture, and livestock operations. With 56+ completed installations across Wales and 6 years serving Pembrokeshire farms, our team understands the specific energy demands and building characteristics of this region.
Pembrokeshire's agricultural community spans Dairy farming, Mixed agriculture, Livestock operations, Sheep farming operations — each with distinct energy profiles and building types. Our surveyors assess roof orientation, structural load capacity, and DNO connection constraints before designing a system optimised for your operation. We install on steel portal-frame buildings, timber-framed barns, concrete-block structures, and older brick-built farm buildings across Pembrokeshire.
Pembrokeshire is accessible via A40 and A477 roads, Haverfordwest Station, Cardiff Airport, allowing our installation crews to reach farms across Pembrokeshire efficiently. We coordinate with local Distribution Network Operators to manage grid connection applications, and handle all MCS documentation required for Smart Export Guarantee eligibility.
Why Pembrokeshire Farmers Choose Us
- MCS-certified installers — required for Smart Export Guarantee eligibility
- 56+ completed projects across Wales
- Specialists in Dairy farming and Mixed agriculture solar installations
- In-house structural surveyors familiar with Pembrokeshire building stock
- PPA financing available — zero upfront cost, immediate savings
How Solar Works for Dairy farming Operations in Pembrokeshire
Dairy operations in Pembrokeshire are among the highest electricity consumers in UK agriculture — bulk tank refrigeration, milking equipment, and parlour lighting run consistently through daylight hours, creating the ideal load profile for solar generation. A correctly sized system can displace 60–80% of your electricity demand directly, with surplus fed to the grid under the Smart Export Guarantee.
Typical System Sizes for Pembrokeshire Farm Buildings
| Operation Size | System Size | Est. Annual Generation | Indicative Bill Savings |
|---|---|---|---|
| Small — single building | 30–50 kWp | 27,000–45,000 kWh/yr | £7,000–£12,000/yr |
| Medium — 2–3 buildings | 80–120 kWp | 72,000–108,000 kWh/yr | £18,000–£28,000/yr |
| Large — multi-building | 150–250 kWp | 135,000–225,000 kWh/yr | £35,000–£58,000/yr |
Estimates based on average UK irradiance figures at 900 kWh/kWp/year and electricity at 25p/kWh. Actual figures vary by orientation, shading, and tariff. Use our calculator for a site-specific estimate.
Government Grants for Pembrokeshire Farmers
Welsh farmers in Pembrokeshire can apply for the Welsh Government's Sustainable Farming Scheme (SFS) capital grants, TESS (Transforming the Economy through Sustainable Societies) funding, and UK-wide programmes including the Farming Investment Fund. Our team includes a dedicated grant specialist who reviews eligibility and prepares funding applications for every client — at no additional charge. Ask about grants during your free survey.
Solar Panel Services for Farm Buildings Near Pembrokeshire
We install solar on all types of agricultural buildings across Pembrokeshire. Select the service most relevant to your operation.
Dairy Farm Solar — Pembrokeshire
Milking parlour and dairy barn solar for Pembrokeshire dairy farmers. Power refrigeration, cooling, and lighting.
View serviceGrain Store Solar — Pembrokeshire
Offset grain drying and storage energy costs with roof-mounted solar on your Pembrokeshire grain stores.
View serviceLivestock Building Solar
Ventilation, heating, and lighting systems for livestock buildings across Pembrokeshire.
View serviceCattle Shed Solar
Solar solutions for beef and dairy cattle housing. Reduce winter energy bills across Pembrokeshire farms.
View servicePoultry House Solar
High-consumption poultry operations in Pembrokeshire benefit most from solar. Typical savings: 40–65%.
View serviceBarn Solar Panels
General-purpose farm barn installations across Pembrokeshire and Pembrokeshire.
View serviceLocal Knowledge for Pembrokeshire Farms
Pembrokeshire's agricultural landscape includes Dairy farming, Mixed agriculture, Livestock operations, Sheep farming operations spread across diverse terrain. Our Wales team has built deep expertise in the planning requirements, DNO constraints, and building types specific to Pembrokeshire.
Regional Planning Expertise
Familiar with Pembrokeshire Council agricultural planning rules and permitted development rights for solar on farm buildings
DNO Grid Connections
Experienced managing grid connection applications with Wales distribution network operators for agricultural systems
Financing Options
PPA, agricultural loans, and outright purchase options tailored for Pembrokeshire farm businesses of all sizes
MCS Certified
Full MCS certification ensures your Pembrokeshire installation qualifies for the Smart Export Guarantee and any applicable government incentives
4.9/5 Rating
56+ Wales installations
Areas We Cover Around Pembrokeshire
We serve the entire Pembrokeshire region and surrounding areas. Our installation teams travel across Wales to reach your farm.
Primary Service Area
- Pembrokeshire and immediate surrounds
- All of Pembrokeshire
- Rural parishes and agricultural estates
- Market towns across Wales
Local Landmarks & Areas
- Near Pembrokeshire Coast
- Near St. Davids Cathedral
- Near Tenby
We cover all areas within 80km of Pembrokeshire. For farms further afield in Wales, contact us — we regularly serve sites across the wider region.
Nearby Counties We Also Cover
Our Wales teams also serve farms across these neighbouring areas:
Solar Panel FAQs for Pembrokeshire Farm Owners
Common questions from farmers across the region about agricultural solar installations.
Power Purchase Agreement Available for Pembrokeshire Farms
No upfront capital required. We install and own the system — you buy the electricity at a fixed rate below your current tariff. Typical savings start from day one.
Free Site Survey for Pembrokeshire Farms
Our Pembrokeshire surveyors will visit your farm, assess your buildings, and produce a detailed proposal showing projected generation, savings, payback period, and financing options — at no cost and no obligation.
What's Included in Your Free Assessment
- Roof structural survey and orientation analysis
- Energy consumption review and solar offset modelling
- System size recommendations with ROI projections
- DNO pre-application check for Pembrokeshire
- Financing options including PPA with £0 upfront
Get in Touch
Start Saving on Farm Energy Costs in Pembrokeshire
Join 56+ farms across Wales that have cut their electricity bills with agricultural solar installations.