Farm solar and Asda supplier sustainability: what to check

Scope 1, 2 and 3 explained for farmers, what an on-farm array changes, and what Asda itself publishes. No claim that it requires or rewards solar.

  • Independent guidance
  • Sources checked 20 Oct 2026

Asda’s corporate pages (corporate.asda.com) would not load for our fetch tool on 20 October 2026: the site returned errors, so we have not read its current supplier material. This page therefore makes no statement about what Asda asks of suppliers, and no claim that it requires, accepts or rewards farm solar. It explains the Scope 1, 2 and 3 terms used in supplier reporting and what an array changes.

Where to find Asda’s own requirements

Read Asda’s own published ESG report and supplier information, and ask your buyer in writing which methodology, platform and deadlines apply to your contract. Do not rely on third-party summaries of Asda’s programme, including this one: we cite none because we could not check them against Asda’s own pages.

Scope 1, 2 and 3 on a farm

Three terms recur. Scope 1: direct emissions from owned or controlled sources. Scope 2: emissions from the generation of purchased electricity the business consumes. Scope 3: everything else its activities cause at sources it does not own or control. The Corporate Standard requires scopes 1 and 2 to be reported and gives companies flexibility over scope 3.

What an on-farm array changes

An array mainly changes the farm’s Scope 2 figure: each kilowatt-hour it supplies to the farm is one you no longer buy. At the DESNZ 2026 UK electricity factor of 0.13096 kg CO2e per kWh, avoiding 60,000 kWh of purchases is about 7.86 tonnes CO2e (60,000 × 0.13096 = 7,858 kg). Exported kWh are not consumed on the farm, so they do not reduce purchased-electricity emissions.

What to ask your buyer

Get these answers before you plan:

  • whether the data request is contractual or voluntary;
  • which reporting year and deadline apply;
  • whether your figures or a retailer estimate will be used;
  • whether imported, self-used and exported electricity are distinguished;
  • who to contact when the portal and template disagree.

Do not size an array around a supplier scheme

A retailer’s sustainability page is not an instruction to buy panels. We have not read Asda’s supplier material, so we make no statement about it. Until your buyer says otherwise in writing, plan around the farm’s own electricity use, using farm solar cost guide, grants and funding and solar panel weight and roof loading.

Roof and system questions are in solar panels for agricultural buildings. The same checklist is set out for suppliers to M&S, Tesco and Sainsbury’s.

Sources checked 20 October 2026. Figures and dates are the organisations’ own statements, paraphrased.
Point on this pageSourceDate
Asda’s corporate pages returned errors to our fetch tool; no Asda-specific claim is madecorporate.asda.com (not read)20 Oct 2026
Scope 1, 2, 3 definitions; purchased goods and services; location- and market-based Scope 2GHG Protocol Corporate Standard p.27, Scope 3 Standard, Scope 2 Guidanceundated; 2015
UK electricity 0.13096 kg CO2e/kWh (Scope 2); transmission and distribution 0.01299 (Scope 3)DESNZ conversion factors 202611 Jun 2026, updated 31 Jul 2026

Common questions

Does Asda require farm solar?

We have not read Asda’s supplier material, so we cannot say. Ask your buyer in writing and read Asda’s published ESG report.

Which emission factor should I use?

Use the one your Asda buyer’s template specifies. DESNZ’s 2026 conversion factors give 0.13096 kg CO2e per kWh for UK electricity (Scope 2) and 0.01299 for transmission and distribution losses (Scope 3).

How do I show an array in a supplier carbon report?

Record imported, generated, self-used and exported kWh from meter readings, and apply the emission factor your Asda buyer specifies to the kWh you no longer buy. Failing that, use the DESNZ factors for the reporting year. Keep readings and invoices.

Other UK supermarket and processor supplier pages

See our coverage of the major UK retailer and processor supplier schemes:

Independent, data-led farm solar guidance

  • Independent specialist guidance
  • Sourced 2026 rates & grant data — last reviewed July 2026