Farm solar and Morrisons net zero farming: what to check

Scope 1, 2 and 3 explained for farmers, what an on-farm array changes, and what Morrisons itself publishes. No claim that it requires or rewards solar.

  • Independent guidance
  • Sources checked 20 Oct 2026

Morrisons announced a net zero farming pledge in 2021, and its current climate page states different dates. This page sets both out, explains the Scope 1, 2 and 3 terms behind them, and says what an on-farm array does to a farm’s own figures. It makes no claim that Morrisons requires, accepts or rewards solar.

What Morrisons publishes

FarmingUK reported on 8 March 2021 that Morrisons planned to buy only from net zero carbon farms by 2030, using farm models that cut emissions through breeds, feed and renewable energy. Its Energy & Climate page (undated) now states net zero by 2050, with 2035 Scope 3 cuts of 48.5% for agriculture (FLAG) and 40% for other emissions against 2019. Its Sustainable Sourcing page (undated) sets welfare and regenerative expectations and lists no on-farm renewable energy. Ask which dates apply to your contract.

Scope 1, 2 and 3 on a farm

Supplier requests use the GHG Protocol’s three scopes. Scope 1 is direct emissions from sources a business owns or controls, such as fuel burned in its vehicles and boilers. Scope 2 is emissions from the generation of purchased electricity it consumes. Scope 3 is all other indirect emissions. A farm reports its own Scopes 1 and 2; to the retailer, the farm’s emissions sit in the retailer’s Scope 3.

What an on-farm array changes

The method matters. The GHG Protocol Scope 2 Guidance describes a location-based method, using average grid emissions intensity, and a market-based method, reflecting the contracts a business has chosen. On the location-based method with the DESNZ 2026 factor (0.13096 kg CO2e per kWh), avoiding 100,000 kWh of purchases is 13,096 kg, about 13.1 tonnes CO2e. Ask which method the buyer wants.

What to ask your buyer

Questions for your technical manager:

  • what the template asks for, and in what units;
  • whether last year’s submission can be a baseline;
  • how electricity from an on-farm array should be recorded;
  • whether farm electricity is classed under agriculture or energy in the inventory;
  • how the figures are checked, and by whom.

Do not size an array around a supplier scheme

The only renewable energy reference cited is the 2021 farm-models report; none says solar is required, accepted or rewarded. Build the case for an array on the farm’s own numbers: load profile, roof (solar panel weight and roof loading), price baseline (farm solar cost guide) and tax (grants and funding). If a buyer asks for evidence, supply meter readings and the DESNZ arithmetic above.

The same checklist appears for suppliers to Waitrose, Lidl GB and Aldi UK; solar panels for agricultural buildings covers the roof and system questions.

Sources checked 20 October 2026. Figures and dates are the organisations’ own statements, paraphrased.
Point on this pageSourceDate
2021 pledge: net zero carbon farms by 2030; models include renewable energyFarmingUK, Morrisons’ farmer suppliers to be ‘net zero by 2030’8 Mar 2021
Net zero by 2050; 2035 Scope 3: FLAG 48.5%, other 40% (2019 base)Morrisons, Energy & Climateundated
Welfare and regenerative expectations; no on-farm renewable energy listedMorrisons, Sustainable Sourcingundated
Scope 1, 2, 3 definitions; purchased goods and services; location- and market-based Scope 2GHG Protocol Corporate Standard p.27, Scope 3 Standard, Scope 2 Guidanceundated; 2015
UK electricity 0.13096 kg CO2e/kWh (Scope 2); transmission and distribution 0.01299 (Scope 3)DESNZ conversion factors 202611 Jun 2026, updated 31 Jul 2026

Common questions

Does Morrisons require farm solar?

Nothing on the pages cited says so. The 2021 FarmingUK report mentioned renewable energy as one lever in farm models, not a requirement. Ask your buyer which commitments apply to your contract.

Which emission factor should I use?

Use the one your Morrisons buyer’s template specifies. DESNZ’s 2026 conversion factors give 0.13096 kg CO2e per kWh for UK electricity (Scope 2) and 0.01299 for transmission and distribution losses (Scope 3).

How do I show an array in a supplier carbon report?

Record imported, generated, self-used and exported kWh from meter readings, and apply the emission factor your Morrisons buyer specifies to the kWh you no longer buy. Failing that, use the DESNZ factors for the reporting year. Keep readings and invoices.

Other UK supermarket and processor supplier pages

See our coverage of the major UK retailer and processor supplier schemes: