We found no Waitrose programme called First Generation in public sources on 20 October 2026. The farming programme Waitrose publishes is Farming for Nature, so this page covers that and the Scope 1, 2 and 3 terms around it. It makes no claim that Waitrose requires, accepts or rewards farm solar.
What Waitrose publishes
The John Lewis Partnership’s release of 7 May 2024 launched Farming for Nature to help more than 2,000 British farmers adopt regenerative practices, with a Leckford Centre of Excellence, LEAF satellite farms and help to access finance, and set 2035 for regenerative sourcing. Its 29 October 2025 release states regenerative practices on all Waitrose UK farms by 2030 and net zero across them by 2035; its 20 August 2026 release gives 2030 for all own-brand UK meat, milk, eggs, fruit and vegetables. None mentions on-farm solar.
Scope 1, 2 and 3 on a farm
Three terms recur. Scope 1: direct emissions from owned or controlled sources. Scope 2: emissions from the generation of purchased electricity the business consumes. Scope 3: everything else its activities cause at sources it does not own or control. The Corporate Standard requires scopes 1 and 2 to be reported and gives companies flexibility over scope 3.
What an on-farm array changes
The method matters. The GHG Protocol Scope 2 Guidance describes a location-based method, using average grid emissions intensity, and a market-based method, reflecting the contracts a business has chosen. On the location-based method with the DESNZ 2026 factor (0.13096 kg CO2e per kWh), avoiding 30,000 kWh of purchases is 3,929 kg, about 3.93 tonnes CO2e. Ask which method the buyer wants.
What to ask your buyer
Put these to the buyer before buying anything:
- which standard or protocol the request is based on;
- whether emissions are requested per farm, per product or per tonne;
- how often the data must be refreshed;
- whether meter readings or supplier invoices are the accepted evidence;
- whether any on-farm generation must be reported separately.
Do not size an array around a supplier scheme
None of the Waitrose releases cited says solar is required, accepted or rewarded. Treat any claim that a retailer requires, accepts or rewards farm solar as unverified until your buyer confirms it in writing. Size the array to the farm’s own load: farm solar cost guide and grants and funding cover the baseline and tax, and solar panel weight and roof loading the roof.
Roof and system questions are in solar panels for agricultural buildings. The same checklist is set out for suppliers to Lidl GB, Aldi UK and Asda.
| Point on this page | Source | Date |
|---|---|---|
| Farming for Nature: 2,000+ farmers, Leckford centre, LEAF farms; regenerative sourcing by 2035 | John Lewis Partnership, Farming for Nature launch | 7 May 2024 |
| Regenerative practices on Waitrose UK farms by 2030; net zero across them by 2035 | John Lewis Partnership, farming commitments release | 29 Oct 2025 |
| Own-brand UK meat, milk, eggs, fruit and vegetables from regenerative farms by 2030 | John Lewis Partnership, regenerative farming series release | 20 Aug 2026 |
| GHG Protocol: what the scopes mean, where purchased food sits, and the two Scope 2 methods | GHG Protocol Corporate Standard p.27, Scope 3 Standard, Scope 2 Guidance | undated; 2015 |
| DESNZ factors for UK electricity: 0.13096 kg CO2e/kWh (Scope 2), 0.01299 for T&D losses (Scope 3) | DESNZ conversion factors 2026 | 11 Jun 2026, updated 31 Jul 2026 |
Common questions
Does Waitrose require farm solar?
None of the three John Lewis Partnership releases cited says so. They describe regenerative practice, measurement and support for farmers. Ask your buyer in writing.
Do exported kWh reduce my Scope 2 figure?
Not on the GHG Protocol definition, which limits Scope 2 to purchased electricity the business consumes. Ask your Waitrose buyer whether exports should be recorded separately.
Is an array Scope 1, 2 or 3 for my farm?
Mostly Scope 2: under the GHG Protocol that scope is purchased electricity the business consumes, so self-used array kWh replace purchases and exports do not. Fuel you burn on the farm is Scope 1.