Tesco Stronger Starts is a schools and young-people programme, not a supplier scheme, so this page does not link it to farm solar. It covers what Tesco publishes for suppliers and how an on-farm array relates to Scope 1, 2 and 3 reporting. It makes no claim that Tesco requires, accepts or rewards farm solar.
What Tesco publishes
Tesco’s Sustainability Report 2026 sets net zero across its value chain by the end of 2050 (SBTi-validated) and in its own operations by 2035, with 2032 Scope 3 cuts from a 2019/20 baseline of 39% in forests, land and agriculture (FLAG) emissions and 55% in energy and industrial emissions. For farmers it describes Sustainable Farming Groups, incentives for over 400 farmers, data baselining and two low carbon concept farms. Its solar references are to Tesco’s own stores, depots and fleet; we found none on supplier farms.
Scope 1, 2 and 3 on a farm
Supplier requests use the GHG Protocol’s three scopes. Scope 1 is direct emissions from sources a business owns or controls, such as fuel burned in its vehicles and boilers. Scope 2 is emissions from the generation of purchased electricity it consumes. Scope 3 is all other indirect emissions. A farm reports its own Scopes 1 and 2; to the retailer, the farm’s emissions sit in the retailer’s Scope 3.
What an on-farm array changes
An array mainly changes the farm’s Scope 2 figure: each kilowatt-hour it supplies to the farm is one you no longer buy. At the DESNZ 2026 UK electricity factor of 0.13096 kg CO2e per kWh, avoiding 20,000 kWh of purchases is about 2.62 tonnes CO2e (20,000 × 0.13096 = 2,619 kg). Exported kWh are not consumed on the farm, so they do not reduce purchased-electricity emissions.
What to ask your buyer
Ask in writing:
- which methodology and emission factors the template uses;
- whether it wants Scope 1 and 2 separately, and for which years;
- which platform collects the data and who holds the login;
- what evidence it expects, such as meter readings and invoices;
- how it treats electricity generated on the farm.
Do not size an array around a supplier scheme
None of the Tesco pages cited says solar is required, accepted or rewarded. Treat any claim that a retailer requires, accepts or rewards farm solar as unverified until your buyer confirms it in writing. Size the array to the farm’s own load: farm solar cost guide and grants and funding cover the baseline and tax, and solar panel weight and roof loading the roof.
Roof and system questions are in solar panels for agricultural buildings. The same checklist is set out for suppliers to Sainsbury’s, Morrisons and Waitrose.
| Point on this page | Source | Date |
|---|---|---|
| Net zero 2050 (value chain), 2035 (operations); 2032 Scope 3 cuts: FLAG 39%, other 55% | Tesco Sustainability Report 2026 (pp.7, 12, 21, 26, 40) | 2026 |
| Farming Groups, 400+ farmer incentives, data baselining; Stronger Starts = school fruit and veg and apprenticeships | Tesco Sustainability Report 2026 (pp.7, 12, 21, 26, 40) | 2026 |
| Scope 1, 2, 3 definitions; purchased goods and services; location- and market-based Scope 2 | GHG Protocol Corporate Standard p.27, Scope 3 Standard, Scope 2 Guidance | undated; 2015 |
| UK electricity 0.13096 kg CO2e/kWh (Scope 2); transmission and distribution 0.01299 (Scope 3) | DESNZ conversion factors 2026 | 11 Jun 2026, updated 31 Jul 2026 |
Common questions
Does Tesco require farm solar?
Nothing in Tesco’s 2026 sustainability report says so. It describes Sustainable Farming Groups, incentives and data baselining. Check your supply agreement and ask your buyer in writing.
How do I show an array in a supplier carbon report?
Record imported, generated, self-used and exported kWh from meter readings, and apply the emission factor your Tesco buyer specifies to the kWh you no longer buy. Failing that, use the DESNZ factors for the reporting year. Keep readings and invoices.
Which emission factor should I use?
Use the one your Tesco buyer’s template specifies. DESNZ’s 2026 conversion factors give 0.13096 kg CO2e per kWh for UK electricity (Scope 2) and 0.01299 for transmission and distribution losses (Scope 3).
Other UK supermarket and processor supplier pages
See our coverage of the major UK retailer and processor supplier schemes: