Skip to main content
Solar panels on farm buildings in Preston, Lancashire
Serving Preston & Lancashire

Solar Panels for Farm Buildings in Preston

MCS-certified agricultural solar installations for Lancashire's farming community. Reduce energy costs by up to 65% with a system sized for your operation.

76+

Projects in North West England

7

Years Serving Lancashire

40–65%

Typical Energy Cost Reduction

25yr

Panel Performance Warranty

Agricultural Solar Panel Specialists in Preston

Serving Preston and Lancashire's agricultural community with solar panel installations for farm buildings, supporting mixed farming, dairy operations, and hill farming across the county. With 76+ completed installations across North West England and 7 years serving Lancashire farms, our team understands the specific energy demands and building characteristics of this region.

Preston's agricultural community spans Mixed farming, Dairy operations, Hill farming, Livestock operations operations — each with distinct energy profiles and building types. Our surveyors assess roof orientation, structural load capacity, and DNO connection constraints before designing a system optimised for your operation. We install on steel portal-frame buildings, timber-framed barns, concrete-block structures, and older brick-built farm buildings across Lancashire.

Preston is accessible via M6 and M65 motorways, Preston Station, Manchester Airport, allowing our installation crews to reach farms across Lancashire efficiently. We coordinate with local Distribution Network Operators to manage grid connection applications, and handle all MCS documentation required for Smart Export Guarantee eligibility.

Why Lancashire Farmers Choose Us

  • MCS-certified installers — required for Smart Export Guarantee eligibility
  • 76+ completed projects across North West England
  • Specialists in Mixed farming and Dairy operations solar installations
  • In-house structural surveyors familiar with Lancashire building stock
  • PPA financing available — zero upfront cost, immediate savings

How Solar Works for Mixed farming Operations in Preston

Mixed farming enterprises in Preston often have the most diverse range of suitable buildings — grain stores, livestock housing, machinery stores, and farm offices can all carry solar panels, allowing a phased approach that starts with the highest-consumption buildings and expands over time. Aggregating generation from multiple roofs into a single DNO connection application can reduce connection costs significantly.

Typical System Sizes for Lancashire Farm Buildings

Operation Size System Size Est. Annual Generation Indicative Bill Savings
Small — single building 30–50 kWp 27,000–45,000 kWh/yr £7,000–£12,000/yr
Medium — 2–3 buildings 80–120 kWp 72,000–108,000 kWh/yr £18,000–£28,000/yr
Large — multi-building 150–250 kWp 135,000–225,000 kWh/yr £35,000–£58,000/yr

Estimates based on average UK irradiance figures at 900 kWh/kWp/year and electricity at 25p/kWh. Actual figures vary by orientation, shading, and tariff. Use our calculator for a site-specific estimate.

Government Grants for Preston Farmers

Lancashire farmers can apply for the Farming Investment Fund (FIF) Productivity and Infrastructure Grant, which covers eligible solar equipment. Enhanced Capital Allowances allow full first-year tax deduction on qualifying installations. The Smart Export Guarantee provides ongoing income for surplus electricity. Our team includes a dedicated grant specialist who reviews eligibility and prepares funding applications for every client — at no additional charge. Ask about grants during your free survey.

Local Knowledge for Lancashire Farms

Preston's agricultural landscape includes Mixed farming, Dairy operations, Hill farming, Livestock operations operations spread across diverse terrain. Our North West England team has built deep expertise in the planning requirements, DNO constraints, and building types specific to Lancashire.

Regional Planning Expertise

Familiar with Lancashire Council agricultural planning rules and permitted development rights for solar on farm buildings

DNO Grid Connections

Experienced managing grid connection applications with North West England distribution network operators for agricultural systems

Financing Options

PPA, agricultural loans, and outright purchase options tailored for Lancashire farm businesses of all sizes

MCS Certified

Full MCS certification ensures your Preston installation qualifies for the Smart Export Guarantee and any applicable government incentives

MCS-certified solar panel installation on agricultural building in Lancashire

4.9/5 Rating

76+ North West England installations

Areas We Cover Around Preston

We serve the entire Lancashire region and surrounding areas. Our installation teams travel across North West England to reach your farm.

Primary Service Area

  • Preston and immediate surrounds
  • All of Lancashire
  • Rural parishes and agricultural estates
  • Market towns across North West England

Local Landmarks & Areas

  • Near Preston Minster
  • Near Avenham Park
  • Near Harris Museum

We cover all areas within 80km of Preston. For farms further afield in North West England, contact us — we regularly serve sites across the wider region.

Solar Panel FAQs for Preston Farm Owners

Common questions from farmers across the region about agricultural solar installations.

Power Purchase Agreement Available for Preston Farms

No upfront capital required. We install and own the system — you buy the electricity at a fixed rate below your current tariff. Typical savings start from day one.

Free Site Survey for Preston Farms

Our Lancashire surveyors will visit your farm, assess your buildings, and produce a detailed proposal showing projected generation, savings, payback period, and financing options — at no cost and no obligation.

01234 567890 info@solarpanelsforfarmbuildings.co.uk
Covering Preston, Lancashire and surrounding areas within North West England

What's Included in Your Free Assessment

  • Roof structural survey and orientation analysis
  • Energy consumption review and solar offset modelling
  • System size recommendations with ROI projections
  • DNO pre-application check for Lancashire
  • Financing options including PPA with £0 upfront

Get in Touch

Solar panels on farm building

Start Saving on Farm Energy Costs in Preston

Join 76+ farms across North West England that have cut their electricity bills with agricultural solar installations.