Solar Panels for Pig Farms, Farrowing Houses & Finishing Units
High-performance solar installations designed for the intensive energy demands of modern pig production — from ventilation and heating to lighting and feeding systems. Serving pig farms across the UK.
Why Pig Farms Are Among the Highest Energy Users in Agriculture
Commercial pig production is one of the most energy-intensive farming enterprises in the UK. Controlled environment pig buildings require continuous ventilation, precise temperature management, automated feeding systems, and high-intensity lighting — all around the clock, every day of the year. This combination of high, consistent energy demand makes pig units exceptional candidates for solar panel installations, with the potential for some of the fastest payback periods in UK agriculture.
The Agriculture and Horticulture Development Board (AHDB) estimates that electricity accounts for 3-6% of total production costs on UK pig units, with the average indoor finishing unit spending £25,000-£60,000 per year on electricity. A well-designed solar installation can reduce this by 40-65%, delivering annual savings of £10,000-£40,000 depending on farm size and energy profile.
Our team has installed solar panels on pig farms of all sizes, from 500-sow farrow-to-finish units to specialist finisher sites with 5,000+ pig places. We understand the operational requirements of pig production and design systems around your specific energy profile, biosecurity needs, and building characteristics. View our full range of farm building solar services or review typical solar installation costs for agricultural buildings.
Energy Consumption Profile: Where Pig Farms Use the Most Electricity
| Energy Consumer | Typical kWh/year (500-sow unit) | % of Total | Solar Match |
|---|---|---|---|
| Ventilation fans | 35,000-60,000 | 35-45% | Excellent |
| Farrowing floor heating | 20,000-40,000 | 20-30% | Good with battery |
| Lighting (all buildings) | 10,000-20,000 | 10-15% | Excellent |
| Feed augering and mixing | 8,000-15,000 | 8-12% | Excellent |
| Pressure washers & water | 5,000-12,000 | 5-10% | Good |
Figures are indicative for a 500-sow farrow-to-finish unit with approximately 4,000 pig places at any one time. Actual consumption varies with housing system, stocking density, and management practices.
Recommended Solar System Sizes for Different Pig Production Systems
Small Unit
30-50 kW
Up to 200 sows or 2,000 finishers
- • Annual generation: ~27,000-45,000 kWh
- • Typical cost: £28,000-£55,000
- • After grants: £16,000-£32,000
- • Annual savings: £6,500-£13,000
- • Payback: 2-5 years
Medium Unit
80-120 kW
200-500 sows or 2,000-5,000 finishers
- • Annual generation: ~72,000-110,000 kWh
- • Typical cost: £75,000-£130,000
- • After grants: £44,000-£77,000
- • Annual savings: £17,000-£30,000
- • Payback: 2.5-4.5 years
Large Unit
150-300 kW
500+ sows or 5,000+ finishers
- • Annual generation: ~135,000-270,000 kWh
- • Typical cost: £145,000-£300,000
- • After grants: £86,000-£178,000
- • Annual savings: £32,000-£68,000
- • Payback: 2-4 years
Costs and savings are illustrative and based on 2025 electricity prices of 27p/kWh. Actual figures depend on your specific buildings, location, and energy profile. All costs shown after applicable grants and tax relief where stated.
Grants and Funding for Solar Panels on Pig Farms
Pig farms registered as agricultural businesses in England can apply for Farming Investment Fund (FIF) grants covering 25% of eligible solar installation costs. Annual Investment Allowance (AIA) provides 100% first-year tax relief on the remaining cost. The Smart Export Guarantee (SEG) provides ongoing income for any surplus electricity exported to the National Grid.
For full details of the grants available, including the application process and eligibility criteria, see our comprehensive guide to government grants for farm solar. We provide a free grant eligibility assessment as part of every initial survey.
Frequently Asked Questions About Pig Farm Solar
Find Out How Much Your Pig Unit Could Save
Book a free site survey with one of our agricultural solar specialists. We'll assess your pig buildings, analyse your energy bills, and produce a detailed financial case for solar — at no charge.
Talk to Our Pig Farm Solar Specialists
Contact us for a free, no-obligation assessment of your pig unit's solar potential.
Get in Touch
Related Agricultural Solar Services
Explore our full range of specialist farm building solar installations.
Dairy Farm Solar
Milking parlour, bulk tank, and cubicle housing systems. Savings of 40–65% for dairy operations.
Grain Store Solar
Offset grain drying energy. Peak solar generation aligns perfectly with harvest season.
Livestock Farm Solar
Pig units, sheep housing, and cattle barns. Reduce ventilation, heating, and feeding costs.
Cattle Shed Solar
Solar for beef and dairy cattle housing. Large roof spans maximise generation capacity.
Poultry House Solar
High-consumption poultry operations save most with solar. Typical payback 3–5 years.
Farm Barn Solar
General-purpose agricultural barns. Large uninterrupted roof spans ideal for high-capacity arrays.
Milking Parlour Solar
Fastest payback on any dairy building. Purpose-designed for vacuum pump and bulk tank loads.
All Services
View the complete range of farm solar services
Available Across the UK's Key Farming Counties
We serve agricultural businesses in every UK county. Below are some of our most active agricultural regions: